27.5.15

14.4.15

The posts have now been concreted in their holes and the supports removed.
The concrete slab will be extended which will add another 100mm to the foundations.

Footings



10.4.15

Posts have been bolted up to the roof frame, now to whack some concrete in the post holes and take the supports away.

New Red Posts


27.3.15

Weather Proofing the Rear Door

The House Rear door was not protected from the driving rain so it was decided to add a cover over the rear door and hot water service.
When finished the rear door will be able to be open even if it rains.

Mark Gives New Rear Porch Thumbs up


1.8.12

26.9.11

31.8.11

Pool Room Tele :

we whacked up Mark's new tele yesterday, it's a 1080p LCD LED jigger from Dick Smith, about $470 I think

21.4.11

we have finished covering up all the joins in the boxing over the steel beams, the screws will be covered and painted and another coat on the cover strips :

12.4.11

11.1.11

Beam - middle of Music room :

18.12.10

Music Room Beam :

6.7.10

Trevor - is impressed with side panels :

3.5.10

Mark Displaying More of His Amazing New Handyman Skills

27.4.10

Gable :

Mark is Developing Some Amazing Handyman Skills:

20.4.10

Gable Ends :

we are now ready to fix the vertical battens to the frame (frame has timber fixed to it so we can screw the battens to something) Mark is fixing some painted timber to the steel frame, notice we painted the frame black so it wont be visible between the battens.

6.4.10

Garden Edging Finished :

Mark showing his amazing drilling skills :